Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year--2008 <br />McClane Canyon Mine C-1980-004 McClane Canyon Mining, LLC <br />------ ----------------------- ------------------- <br />mine name <br />permit # Permittee <br />Address: - 3148 Highway 139, P.O. Box 98, Loma, CO 81524 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed 12.9 + 0.0 12,9 <br />Acres backfilled and graded 3.3 + 0.0 3.3 <br />Acres tops iled 3.3 + 0.0 3.3 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />P.grh CAtPr7nrv hPlnw nn nnf inrli.rro nn-c flint lin- -k;--4 C-1 nom,.,.,. n. _ <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total' less ears' <br /> <br />Acres seeded 3.3 + 0.0 = 3.3 - 3.3 + 0.0 <br />..., U c, ..cL,caaai y, a ucata 1PUUn U1 dny dugmentea Seeaing or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 12_9 ----- and the total number of acres: <br />Phase I released -0 ------- Phase II released __ 0_______ Phase III released -0- <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed _N/A <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2----- 9_6 <br />Acreage in active mining areas s 0.0 <br />'(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not back-filled and graded