My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-30_INSPECTION - M1980178
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1980178
>
2008-12-30_INSPECTION - M1980178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:19 PM
Creation date
1/7/2009 8:52:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980178
IBM Index Class Name
INSPECTION
Doc Date
12/30/2008
Doc Name
Inspection report
From
DRMS
To
Moores Mining Ranching and Mill
Inspection Date
12/9/2008
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $47.55 1 $47.55 $47.55 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $47.55 $47.55 <br />........ . ; _ .... , ....... <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 0.89 0.89 Total non-roadable mob/demob cost " <br />Return time (hours) = 0.89 0.89 ' two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost "* <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 2.78 1.78 <br /> <br />JOB TIME AND COST Total job time <br /> Total job cost
The URL can be used to link to this page
Your browser does not support the video tag.