Laserfiche WebLink
Agency or organization name: DRMS Permit or other job action :Final Reclamation Cost Update <br />Task description :Reduce East HighwaH to 3H:1V <br />RUMM <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D8R Series 11 - 8SU (200,1 Horsepower : _310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis:--- 1-per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $50.32 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $160.22 Total fleet cost/hour : $160.22 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,964 CCY factor : 1.165 volume : 3,453 LCY <br /> <br />Source of estimated volume :Assume 400'L x 20'H filled from 2HAV to 3H:1 V w/matt on crest <br />Source of estimated swell factor :CAT Handbook <br /> <br /> <br />HOURLY PRODUCTION X.X <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 _ <br />(Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 _(avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/da_y)__ <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.36 (Cat HB) <br />Average push gradient : 16.50 % (neg) Altitude : 1.00 (Cat HB)_ <br />Average site altitude : 6,200 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.48 <br />Weight description : <br />Decomposed osed rock - 50% Rock, 50% Earth Adjusted unit production : 676.01 LCY/hr <br /> Adjusted fleet production : 676.01 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 5.11 Hours <br />Unit cost : $0.237 /LCY Total job cost : $818 <br />