My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-05_REVISION - C1980001
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980001
>
2009-01-05_REVISION - C1980001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:27 PM
Creation date
1/6/2009 2:24:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
REVISION
Doc Date
1/5/2009
Doc Name
Letter about Bond Release Inspection
From
DRMS
To
Chevron Mining Inc
Type & Sequence
SL10
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 C O L O RA D O <br />Denver, Colorado 80203 D I V I S 10 N OF <br />Phone: (303) 866-3567 RECLAMATION <br />FAX: (303) 832-8106 MINING <br /> <br /> SAFETY <br />January 5, 2009 <br /> Bill Ritter, Jr. <br /> Governor <br />Leach <br />Steven E <br />. Harris D. Sherman <br />Chevron Mining Inc. Executive Director <br />116 Inverness Drive East Ronald W. Cattany <br />CO 80112 <br />Englewood Division Director <br />, Natural Resource Trustee <br />RE: Edna Strip Mine (Permit No. C-1980-001 <br />Bond Release Application No. 10 (SL-10) <br />Dear Mr. Leach, <br />In accordance with Rule 3.03.2(2) of the Rules and Regulation of the Colorado Mined Land <br />Reclamation Board for Coal Mining, the Division is required to conduct a bond release inspection <br />within 30 days of finding the SL-10 bond release application complete or as soon after, as the Division <br />determines that weather conditions allow. The Division determined the SL-10 bond release application <br />to be complete on 05 January 2009. Based upon the snow cover observed during a partial inspection <br />of the Edna Mine and the bond release area associated with SL-10 conducted on 29 December 2008, <br />the Division believes that this bond release inspection should be scheduled after the snow pack has <br />melted. <br />The Division proposes to schedule the SL-10 bond release inspection during the spring of 2009. <br />Specific scheduling of the SL-10 bond release inspection date will be dependent upon the weather <br />conditions. <br />Please feel free to contact me with any questions. <br />Sincerely, <br />Jason M ck <br />Environmental Protection Specialist <br />cc: Beth Heesen, WWC Engineering, 611 Skyline Road, Laramie, WY 82070 <br />Jim Fulton, OSM <br />office of office of <br />Mined Land Reclamation Denver • Grand Junction Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.