Laserfiche WebLink
-4- <br />12. Primary future (Post-mining) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />_ Rangeland(RL) _ Forestry(FR) <br />Residential(RS) _ Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />V Industrial/Commercial(IC) <br />_ Solid Waste Disposal(WD) <br />13. Primary present land use (check one): <br />- Cropland(CR) - Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />- Developed Water Resources(WR) <br />General Agriculture(GA) <br />_ Wildlife Habitat(WL) <br />k Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. trucklshovel): g t," C'. --J? P !A / In <br />B, <br />15. On Site Processing: )(" 6pishing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: 1U©oUIE- <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />l oevh4er_ ' A N-YE' Y.PSi,R- AO SIO 41 aoA o P,-.0 km <br />t l l !? ? si?S r Ul c 7 i o-'L <br />firm 6i' ?Y lGtVd4-i0Al W®r k !'-QAd1 ta0 AI-4 CA-le_ g <br />544 <br />? ?i Q .