Laserfiche WebLink
The pond is approximately 1.5 acres in size and the rest of the mining operation, <br />that is the sieve operation and stockpiles take approximately another 2 acres. There is no <br />way to separate the pumping from the sieve operation and the returning of unwanted <br />materials back to the pond. When all mining is completed, the pond will be properly back <br />filled and eliminated. The ground will then be used for some other general civil <br />construction business. <br />There are no plans to increase the size of the operation, the pond, the quantity of <br />materials removed. <br />Builders Aggregate, Inc have quit claimed to Double J Concrete the bulk of the <br />property, thereby eliminating the other non-mining operations from the permitted area. <br />Amended April, 2007