My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1977-12-03_REVISION - M1999120
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999120
>
1977-12-03_REVISION - M1999120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:02:39 PM
Creation date
1/5/2009 3:44:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999120
IBM Index Class Name
REVISION
Doc Date
12/3/1977
Doc Name
Adequacy Letter
From
DRMS
To
L.G. Everist, Inc.
Type & Sequence
TR2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> STATE OF COLORADO <br /> ;/bIVIS1ON OF RECLAMATION,MINING AND SAFETY <br /> Department of Natural Resources <br /> 1313 Sherman St.,Room 215 <br /> Denver,Colorado 80203 4C��OL O RA D O <br /> Phone:(303)866-3567 D i v t s t ON OF <br /> FAX:(303) 832-8106 RECLAMATION <br /> MINING <br /> December 3,2007 SAFETY <br /> Ms. Lynn Mayer Shults Bill Ritter,Jr. <br /> r�L.G. Everist, Inc. Governor <br /> 7321 E. 88`h Avenue, Suite 200 Harris D.Sherman <br /> Henderson, CO 80640 Executive Director <br /> Ronald W.Cattany <br /> Division Director <br /> RE: L.G. Everist, Inc., Fort Lupton Sand and Gravel Mine; Permit No. M-1999-120 Natural Resource Trustee <br /> Yf R-02; Adequacy Utter <br /> Dear Ms. Shults, <br /> The Division received Technical Revision 02 (TR-02) for the Fort Lupton Sand and Gravel Mine; <br /> Permit No. M-1999-120 operated by L.G. Everist, Inc. L.G. Everist proposes to change the <br /> reclamation plan in the Golden Reservoir from 4h:ly to 3h:ly slopes. The Division has the <br /> following comments regarding the revision; <br /> 1. The reclamation plan notes a 400'*400' future.oil and gas location in the Golden Reservoir. <br /> Please explain how the revised slopes to 3h:ly will impact the proposed oil and gas pad. <br /> 2. Please revise the reclamation map to note 3h:ly slopes in the Golden Reservoir. <br /> Please be advised that Division's decision due date is set for December 7, 2007. If you feel more <br /> time is needed to complete your reply, the Division can grant an extension to the decision date. This <br /> will be done upon receipt of a written waiver of your right to a decision by December 7, 2007 and <br /> request for additional time. This must be received no later than the deadline date. If you have any <br /> questions,please contact me at(303) 866-4943. <br /> S' cere , <br /> O 6-`1 <br /> En �ca S. Crosby <br /> Environmental Protection Specialist <br /> cc: Carl Mount; DRMS <br /> Office of Office of <br /> Mined Land Reclamation Denver Grand Junction Durango <br />
The URL can be used to link to this page
Your browser does not support the video tag.