Laserfiche WebLink
The Regional Administrator, as a result of the spill or spills, may require <br />Connell Resources to modify the SPCC Plan for; SPCC measures at the <br />facility the facility to prevent reoccurrence of an oil spill. <br />2.3.2 Amendments due to Facility Changes [112.5(a)] <br />The SPCC Plan is amended within six months whenever there is a physical <br />change at the facility that could affect the facility's spill potential (e.g. <br />adding or removing tanks, changing drainage system). <br />2.3.3 Amendments Due to the Five-Year Review [112.5(b)] <br />The SPCC Plan is reviewed and evaluated at least once every five years to <br />determine if the SPCC Plan accurately reflects the facility operations and to <br />determine if better prevention measures could be applied. Even if no <br />additional preventive measures are identified by the facility (i.e. no changes <br />to the facility and SPCC Plan are needed), the five-year review should be <br />documented. <br />2.4 Management Approval [ 112.7] <br />This SPCC Plan has full approval of Connell Resources, Inc. management at <br />a level of authority to commit the necessary resources to fully implement the <br />SPCC plan. <br />2.5 SPCC Plan Sequence [112.7] <br />This SPCC Plan was development in general accordance with the SPCC <br />regulation (40 CFR 112), which states that the SPCC Plan shall follow the <br />sequence of the SPCC regulation (40 CFR 112.7) or include a cross <br />reference. In development of this SPCC Plan, Connell used the sequence <br />established in the SPCC regulation. Some information has been included in <br />the appendices to allow Connell Resources to easily update and change this <br />information. Information include in the appendices has been referenced in <br />the applicable section of the SPCC Plan. <br />2.6 Additional Facilities, Procedures, Methods or Equipment [112.7] <br />This does not apply at this facility