My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-22_REVISION - M1987164
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987164
>
2008-12-22_REVISION - M1987164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:18:27 PM
Creation date
1/5/2009 10:57:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987164
IBM Index Class Name
REVISION
Doc Date
12/22/2008
Doc Name
Adequacy review response
From
Applegate Group, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Regional Administrator, as a result of the spill or spills, may require <br />Connell Resources to modify the SPCC Plan for; SPCC measures at the <br />facility the facility to prevent reoccurrence of an oil spill. <br />2.3.2 Amendments due to Facility Changes [112.5(a)] <br />The SPCC Plan is amended within six months whenever there is a physical <br />change at the facility that could affect the facility's spill potential (e.g. <br />adding or removing tanks, changing drainage system). <br />2.3.3 Amendments Due to the Five-Year Review [112.5(b)] <br />The SPCC Plan is reviewed and evaluated at least once every five years to <br />determine if the SPCC Plan accurately reflects the facility operations and to <br />determine if better prevention measures could be applied. Even if no <br />additional preventive measures are identified by the facility (i.e. no changes <br />to the facility and SPCC Plan are needed), the five-year review should be <br />documented. <br />2.4 Management Approval [ 112.7] <br />This SPCC Plan has full approval of Connell Resources, Inc. management at <br />a level of authority to commit the necessary resources to fully implement the <br />SPCC plan. <br />2.5 SPCC Plan Sequence [112.7] <br />This SPCC Plan was development in general accordance with the SPCC <br />regulation (40 CFR 112), which states that the SPCC Plan shall follow the <br />sequence of the SPCC regulation (40 CFR 112.7) or include a cross <br />reference. In development of this SPCC Plan, Connell used the sequence <br />established in the SPCC regulation. Some information has been included in <br />the appendices to allow Connell Resources to easily update and change this <br />information. Information include in the appendices has been referenced in <br />the applicable section of the SPCC Plan. <br />2.6 Additional Facilities, Procedures, Methods or Equipment [112.7] <br />This does not apply at this facility
The URL can be used to link to this page
Your browser does not support the video tag.