Laserfiche WebLink
Section 2.0 <br />Requirements for the Preparation and Implementation of an SPCC Plan <br />[112.3] <br />The SPCC regulation requires that Connell Resources, Inc. prepare and <br />implement a SPCC Plan for the facility in Hayden, Colorado. The SPCC <br />requires a certification and management approval. The following section are <br />included to explain the requirements of the certification and management <br />approval as well as provide signature blocks for the relevant personnel to <br />sign the certification and approval statements. <br />The SPCC Plan also requires reviews and amendments. The following <br />sections include the requirements for reviews and amendments as well as <br />forms for documenting reviews and amendments. <br />2.1 SPCC Plan Certification [112.3(g), 112.6] <br />Connell Resources chooses to self certify under the requirements of <br />[112.3(g), 112.6]. The certification is included in Appendix A. <br />2.2 SPCC Plan Availability [112.3(e)(1)] <br />The SPCC Plan will be made available in the control house of the asphalt <br />plan to all regulator agencies upon request. This location is attended for four <br />hours or more during normal working hours. <br />2.3 SPCC Plan Amendments [112.4 and 112.5(a)] <br />The SPCC Plan may need to be amended to reflect change at the facility. <br />Additionally, the spill prevention and control measures may need to be <br />revised as a result of spills or due to changes in spill prevention and control <br />technology. The following sections detail the amendment requirements. <br />2.3.1 Amendments Due to Spills [122.4(a) and (c)] <br />If the facility has a spill of 1,000 gallons or more of oil into a waterway, or <br />two spills of 42 gallons or greater or oil into a waterway in twelve month <br />period, the facility is required to submit information to the U.S. <br />Environmental Protection Agency (EPA) Regional Administrator and the