My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-22_REVISION - M1987164
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987164
>
2008-12-22_REVISION - M1987164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:18:27 PM
Creation date
1/5/2009 10:57:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987164
IBM Index Class Name
REVISION
Doc Date
12/22/2008
Doc Name
Adequacy review response
From
Applegate Group, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2.0 <br />Requirements for the Preparation and Implementation of an SPCC Plan <br />[112.3] <br />The SPCC regulation requires that Connell Resources, Inc. prepare and <br />implement a SPCC Plan for the facility in Hayden, Colorado. The SPCC <br />requires a certification and management approval. The following section are <br />included to explain the requirements of the certification and management <br />approval as well as provide signature blocks for the relevant personnel to <br />sign the certification and approval statements. <br />The SPCC Plan also requires reviews and amendments. The following <br />sections include the requirements for reviews and amendments as well as <br />forms for documenting reviews and amendments. <br />2.1 SPCC Plan Certification [112.3(g), 112.6] <br />Connell Resources chooses to self certify under the requirements of <br />[112.3(g), 112.6]. The certification is included in Appendix A. <br />2.2 SPCC Plan Availability [112.3(e)(1)] <br />The SPCC Plan will be made available in the control house of the asphalt <br />plan to all regulator agencies upon request. This location is attended for four <br />hours or more during normal working hours. <br />2.3 SPCC Plan Amendments [112.4 and 112.5(a)] <br />The SPCC Plan may need to be amended to reflect change at the facility. <br />Additionally, the spill prevention and control measures may need to be <br />revised as a result of spills or due to changes in spill prevention and control <br />technology. The following sections detail the amendment requirements. <br />2.3.1 Amendments Due to Spills [122.4(a) and (c)] <br />If the facility has a spill of 1,000 gallons or more of oil into a waterway, or <br />two spills of 42 gallons or greater or oil into a waterway in twelve month <br />period, the facility is required to submit information to the U.S. <br />Environmental Protection Agency (EPA) Regional Administrator and the
The URL can be used to link to this page
Your browser does not support the video tag.