My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-22_REVISION - M1987164
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987164
>
2008-12-22_REVISION - M1987164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:18:27 PM
Creation date
1/5/2009 10:57:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987164
IBM Index Class Name
REVISION
Doc Date
12/22/2008
Doc Name
Adequacy review response
From
Applegate Group, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J Q1 <br />Conclusions and Recommendations <br />Dewatered mining highwall - The resulting factor of safety of 1.701 is above the minimum <br />requirement of 1.5 for the mining highwall. The proposed mining wall is satisfactory. <br />Case 1 - The resulting factors of safety is above the minimum requirement of 1.5 for the steady <br />state reclamation slope case. The proposed mining and reclamation embankments are <br />satisfactory. <br />The following recommendations for monitoring of slope stability should be followed: <br />1. A visual inspection of the excavated highwalls should be done on a weekly basis for the <br />first 6 months of mining. This inspection should consist of walking the existing ground <br />and looking for any signs of stress cracks or other potential signs of slope failure. Some <br />minor sluffing of highwalls is expected on any mine site. The intent of this inspection is <br />to locate potential major slope failures that could potentially extend back into a structure. <br />2. A visual inspection should be done anytime after a major precipitation event that has <br />saturated the ground using the same procedures. A major precipitation event would be <br />defined as a storm that produces an intensity level reached once in 50 years on the <br />average. <br />3. If a visual inspection detects signs of potential slope failure, qualified personnel should <br />be contacted to evaluate and recommend remediation work to stabilize the area. <br />4. If no visible signs of slope failure are detected within the first 6 months, then the <br />inspection period could be reduced to once per month or after every major precipitation <br />event.
The URL can be used to link to this page
Your browser does not support the video tag.