Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Mr. Kevin Riley -4- <br />May 15, 2007 <br />073-2140 <br />A critical component for this design is that a quality control/quality assurance (QC/QA) program <br />consistent with the Golder Phase N design specifications (Specifications) is to be implemented <br />during construction to ensure that the finished product will perform as designed. The Geosynthetic <br />Construction Quality Assurance (CQA) Plan from the Specifications is provided herewith as <br />Attachment 2. Any other relevant sections of the Specifications referenced in this CQA Plan are <br />specifically referenced to the final specifications as included in the Phase V certification report. An <br />experienced full-time, third-party construction quality assurance technician will monitor the work, <br />and a construction as-built report will be completed and submitted to DRMS. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />/rent Principal <br />:LU <br />34_ <br />• <br />%0 *1 <br />?tiGNILL <br />?l <br />David Geier <br />Staff Engineer <br />L^OTSIgg100N.IKLRIMf1,AibNRARR?1>?MYMMIJSIALlYlA130llINWI:N•IfLlAYB1.IN1C Golder Associates