Laserfiche WebLink
ENVIRONMENT, INC. <br />APRIL 7, 2005 <br />PACE 2 <br />water from the box. -.This box will be built on I-beam skids so it <br />can be easily moved. It will be similar to what is shown on-the- <br />enclosed sketch. Once complete, the enclosure will be tested <br />with water to ensure 'it has no leaks. The barrels will be stored <br />in livestock watering tanks with no more than.7 in a 750 gallon <br />tank. The idea is to create a simple low maintenance containment <br />system that can be moved around the mine.as needed. <br />Albert Frei and Sons, Inc., plans to build a permanent <br />concrete enclose sometime in the future. They .are not prepared <br />at this time to commit to a time period or location of this new. <br />enclosure but will contact the Division prior to construction and,- <br />will file the necessary paper work to keep the permit-in-good <br />standing. <br />Conclusion: <br />Albert Frei and'Sons, Inc., will have no more than 6,000 <br />gallons of fuel and no more than 14 barrels of waste lubricant, <br />and,antifreeze products stored on the mine at one time.` The fuel <br />tank and'barrels will be contained-in steel tanks adequate to <br />provide 125$ of the gross volume needed to contain the'largest <br />container in the enclosure. Location of these enclosures may <br />change from time to time.as the mine develops. Any changes to,, <br />this plan will not be done until the Division is notified of the <br />proposed change. <br />If you have any questions please call.me at the above <br />number. <br />Respectfully submitted <br />Environment, Inc. <br />Stevan L. O'Brian <br />cc Albert Frei,and Sons, Inc.. <br />file