Laserfiche WebLink
Attachment 13-4A <br />Pond 011 As-Built Report <br />Introduction <br />This attachment presents the Pond 011 As-Built Report. The report consists <br />of two parts: Part I, Postmine Storage Capacity Addendum, and Part II, Pond <br />As-Built Report.. <br />Part I presents updated SEDCAD demonstrations that incorporate recent <br />(2007) changes to the drainage and sediment control network and, account <br />for current (postmine) watershed conditions in support of retaining Pond <br />011 as a permanent postmine feature. Part II presents the as-built <br />construction documentation (dated 1997) that shows Pond 011 meets or <br />exceeds the design and performance requirements of the Regulations of the <br />Colorado Mined Land Reclamation Board for Coal Mining. <br />• <br />i• <br />Revised 08/08 <br />TR-37 <br />