My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-04_PERMIT FILE - C1994082
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1994082
>
2008-12-04_PERMIT FILE - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:34 PM
Creation date
12/30/2008 10:36:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Permit File
Doc Date
12/4/2008
Doc Name
Part I Pond 010 Postmine Storage Capacity Addendum (TR37)
Section_Exhibit Name
Tab 13 Attachment 13-3A.1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• 10-year, 24-hour event: 1.7 inches <br />• 25-year, 24-hour event: 2.1 inches <br />• 100-year, 24-hour event: 2.5 inches <br />Sedimentology• To determine the sediment loading to the pond, the average <br />annual "R" method was used. The amount of sediment storage is determined for <br />a defined length of time and is based on the design storm R, design storm <br />sediment load, average annual R, and the number of storage years (Y) . R is <br />the rainfall erosivity factor. The equation for required sediment storage <br />is. <br />Required Storage = (Annual R)(# years)(Storm Sediment Load) <br />Storm R <br />The TR-37 SEDCAD4 demonstration used the same annual R value (10) as was used <br />in the TR-30 P.s-Built Report demonstrations. The R value was obtained from. <br />Figure 8A.1, Isolines of R factor for Western U.S., which was taken from <br />Design Hydrology and Sedimentology for Sma11 Catchments (Haar., et. al., <br />1993). <br />A sensitivity analysis wars conducted varying the number of storage years (Y) <br />to maximize sediment storage capacity and maintain compliance with the <br />applicable rules and regulations. The number of storage years (Y) was <br />increased in the Sedimentology sub-routine until the effluent settleable <br />solids concentration in Pond 010 discharge exceeded the water quality <br />criterion (0.5 milliliters per liter [ml/1]), or the model indicated there <br />was between 0.5 and one (1) foot of storage room in the pond (the elevation <br />difference between calcul;sted top of sediment storage and principal spillway <br />invert elevation), as recommended by Warner et a1 (1998). The SEDCAD4 model <br />results present the maximum sediment storage while retaining capacity to <br />store the design storm runoff and maintain compliance with applicable rules <br />and regulations. <br />Reclaimed Condition Storage CapacitV• Results of the TR-37 SEDCAD4 <br />demonstration show the storm runoff volume for the entire watershed from the <br />10-year, 24-hour event to be i.9 acre-feet (ac-ft). The following summarizes <br />Pond 010 storage capacity for the TR-37 10-year, 24-hour event SEDCAD4 <br />demonstration. <br />Principal spillway invert elevation (ft msl) _ <br />Total pond storage capacity (at principal spillway elev.) _ <br />Storm predicted effluent peak settleable concentration = <br />Predicted annual sedimf=_nt loading = <br />Predicted sediment storage capacity = <br />Predicted maximum sediment storage elevation (ft msl) _ <br />Number of storage years (Y) _ <br />6,784.0 ft <br />9.4 ac-ft <br />0.0 ml/1 <br />0.01 ac-ft <br />2.2 ac-ft <br />6,783.1 ft <br />>200 years <br />TR-37 13-3A.1-3 Revised 02/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.