Laserfiche WebLink
<br />Pond 010 <br />P.s-Built Report <br />Postmine Storage Capacity Addendum <br />TABLE OF CONTENTS <br /> <br />• <br /> Page <br />Introduction 13-3A.1-1 <br />Existing Condition Analysis 13-3A.1-1 <br />SCS Curve Number and "k" Factor 13-3A.1-2 <br />Precipitation and Storm Event 13-3A.1-2 <br />Sedimentology 13-3A.1-3 <br />Reclaimed Condition Storage Capacity 13-3A.1-3 <br />Spillways 13-3A.1-4 <br />Summary 13-3A.1-4 <br />Revised Storage Capacity Certification 13-3A.1-4 <br />LIST OF APPENDIX <br />Appendix 13-3A.1-A - 10-Year, 24-Hour Postmine SEDCAD Demonstration <br />Appendix 13-3A.1-B - 25-Year, 24-Hour Postmine SEDCAD Demonstration <br />Appendix 13-3A.1-C - Emergency Spillway, Outflow Channel Requirements <br />for Postmine Conditions <br />TR-37 <br />13-3A.1-i <br />Revised 02/08 <br />