Laserfiche WebLink
HOURLY PRODUCTION <br />Hauling Cauacity sheet 2 of 2 <br />Scraper Payload (weight) Basis : wl (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume : 24.00 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Earth - Dry packed Average volume : <br />r 29.00 LCY <br />Rated payload : 75,000 pounds Adjusted capacity: 29.00 LCY *** <br />Payload capacity : 29.41 LCY hourty <br />ion reflectsvolume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 6,500 <br /> Scraper Push dozer Source <br />Scraper loading time 1.00 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 <br />• minutes Job efficiency : 0.830 NA (Cat HB) <br />load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time : <br />Road condition description : Rutted dirt, little maintenance, no water, 1 " tire penetration <br />Haul Rou te : <br />Seg. # <br />1 Haul distance (feet) <br />300 Grade (%) <br />-6.00 Roll. res. (%) <br />5.00 Total res. (%) <br />-1.00 Velocity (fpm) <br />2972 Travel time (min.)** <br />0.15 <br />2 1,400 -3.00 4.00 1.00 2952 0.47 <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 0.62 minutes <br />1 1,400 3.00 4.00 7.00 2240 0.76 <br />2 300 6.00 5.00 11.00 1434 0.13 <br /> <br /> <br /> <br /> <br /> <br /> <br />uavei ame for each segment is adjusted for acceleration/deceleration. Return time : 0.89 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />T-4 I <br />a scraper team cycle time (load + haul + maneuver and spread + return) : 3.11 minutes <br />Unadjusted unit production/hour : 1,118.94 LCY/hour *** Adjusted for job conditions : 928.72 LCY/tlour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : _2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 928.72 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 928.72 LCY/hour <br />. <br />JOB TIME AND COST <br />- <br />Fleet size : 1 Team(s) Total job time : 11.92 Hours <br />Unit cost : $1.226 /LCY Total job cost : $13,573