Laserfiche WebLink
CIRCES Cost Estimatina Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Permit or other job action : Rn5 <br />Task description : replace topsoil on reclaimed LOM Haulroad <br />HOURLY EQUIPMENT COST <br />sheet 1 of 2 <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />205 State :Colorado Permitfjob # : C-1981-010 <br />1210312007 County: Moffat Abbreviation : none <br />JHB Site : Trapper Mine Filename : C010-205 <br />Scraper work team -Scraper <br />-Push dozer <br />Shift basis : 1 per day <br />Description <br />637G <br />ouppurl equipment -Load area :Cat D10R - 10SU (2005) <br />-Dump area : Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader <br />-Water truck <br /> <br />Cost Breakdown : Scraper Work Team Support Equipment <br /> Scraper Dozer Load area Dump area <br />Import data filename : scraper2 NA dozer dozer <br />% Utilization-machine : 100 NA 100 100 <br />-Ripper attachment : NA NA NA NA <br />Ownerhip cost/hour : $110.37 NA $84.86 $84.86 <br />Operating cost/hour : $177.86 NA $138.49 $138.49 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 <br />Operator cost/hour : $24.95 NA $32.78 $32.78 <br />Unit subtotals : $313.18 NA $256.13 $256.13 <br />Number of units : 4 0 1 1 <br />Group subtotals : Work : $1,252.71 Support : $512.26 <br />Total work team cost/hour <br />Road Maintenance Equipment <br />aderWa <br /> <br /> <br /> <br /> <br />ffi <br /> <br /> <br /> <br /> <br />Maintenance : $0.00 <br />$1,764.96 <br />MA <br />TERIAL QUANTITIES <br />Initial Swell <br />Loose <br />volume : 45,960 CCY factor : 1.125 volume : 51,728 LCY <br />Source of quantity take-off :Appendix A production summaries <br />Source of estimated swell factor : Caterpillar Handbook Edition 34