My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-11_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-11_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:16 PM
Creation date
12/24/2008 2:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
12/11/2007
Doc Name
Adequacy Concerns
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: Division Of Reclamation, Mining And Safety <br />Permit or other job action :RN5 <br />Task description : Regrade cutffill slopes on Ash pit haulroads <br />...... '. ....::!: <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11 SU (2005) Horsepower : 850 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 2 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $107.16 NA <br /> Operating cost/hour : $224.59 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.93 NA <br /> Total unit cost/hour : $364.68 Total fleet cost/hour : $729.36 <br />;... <br />MATERIAL QUANTITIES ,< <br />Initial Swell Loose <br />volume : 316,089 CCY factor : 1.090 volume : 344,537 LCY <br /> <br />Source of estimated volume: Fig. 3.7-1, Map 9 <br />Source of estimated swell factor : Caterpillar Handbook Edition 34 <br /> X. s, <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 4,351.4 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (a vg.) <br />Material consistency description : Job efficiency : 0.81 (2 shifts/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 0.95 (Cat HB) <br />Average push gradient 3.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,700 feet Material weight : 0.88 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,600 Ibs/LCY Net correction : 0.37 <br />Weight description : <br />Clay and gravel - Wet Adjusted unit production : 1595.88 LCY/hr <br /> Adjusted fleet production : 3,191.77 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) Total job time : 107.95 Hours <br />Unit cost : $0.229 /LCY Total job cost : $78,731 <br /> L -X,
The URL can be used to link to this page
Your browser does not support the video tag.