Laserfiche WebLink
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Rip 11,200 fin. ft. Ash pit hau/roads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat 011 R - 11 SU (2005) Horsepower : 850 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 2 per day <br />Attachment no. 2: 1-shank ripper <br />Data source : (CRG) <br />MATERIAL QUANTITIES <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 17.00 acres Rip depth (ft) : 2.00 Volume : 54,853 BCY or CCY <br /> <br />Source of estimated quantity : Permit p. 3-170, Fig. 3.7-1, Map 9 sheet 2 <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2,974.54 cu. yds <br />/hour <br /> . <br />Area : Avg. ripping depth : 2.00 feet/pass Site altitude : 7,000 feet <br />Average ripping width : 7.94 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 500.00 feet/pass Job efficiency factor : 0.81 (2 shifts/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.81 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.922 acres/hour Adjusted unit production : 2,409.38 cu. yds./hour <br />Unadjusted production : 2,974.54 cu. yds./hour Adjusted fleet production : 4,818.76 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 2 dozer(s) Total job time : 11.38 hours <br />Unit cost : $0.121 per cu. yd. Total job cost : $6,629 <br />