My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-11_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-11_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:16 PM
Creation date
12/24/2008 2:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
12/11/2007
Doc Name
Adequacy Concerns
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Division of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Rip 18800 fin. ft. LOM Road <br />.. .. :..... . . <br />.,.::::.;:: <br />«:> <br />HOURLY EQUIPMENT COST - '' ' `' `"' <br />Basic machine : Cat D 11 R - 11 SU (2005) Horsepower : 850 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 2 per day <br />Attachment no. 2: I-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $107.62 NA <br />Dozer operating cost/hour : $135.65 <br /> <br />Ripper operating cost/hour : <br />$15.00 E <br />Operator cost/hour : $32.93 NA <br />Total unit cost/hour : $291.19 Total fleet cost/hour : $1,164.77 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alt <br />ernate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 28.50 acres Rip depth (ft) : 2.00 Volume : 91,960 BCY or CCY <br />Source of estimated quantity: Permit P. 3-170 & Fig. 3.7-1, Map 9 sheets 1,2&3 <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity: NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2 <br />974 <br />54 cu <br />ds <br />/hour <br /> , <br />. . y <br />. <br />Area : Avg. ripping depth : 2.00 feet/pass Site altitude : 6,500 feet <br />Average ripping width : 7.94 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 500.00 feet/pass Job efficiency factor : 0.81 (2 shifts/day) <br />Average dozer speed : <br />- 88.00 feet/minute Net job correction : 0.81 multiplier <br />Average maneuver time: <br />ime : 0.25 minutes/pass <br />Production per unit area : 0.922 acres/hour Adjusted unit production : 2,409.38 cu. yds./hour <br />Unadjusted production : 2,974.54 cu. yds./hour Adjusted fleet production : 9,637.52 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) Total job time : 9.54 hours <br />Unit cost : $0.121 per cu. yd. Total job cost : $11,114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.