Laserfiche WebLink
CIRCES Cost Estimatina Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Division of Reclamation, Mining And Safety <br />188 State :Colorado Permit/job #: C-1981-010 <br />11/30/2007 County : Moffat Abbreviation : none <br />JHB Site : Trapper Mine Filename : C010-188 <br />Permit or other job action : Rn5 <br />Task description : Topsoil addition acreage in Z & G pits (TR98, TR101, MR212) <br />................. <br />............... <br />HOURLY 6UIP ........................................................................... <br />MENT COST <br />Scraper work team -Scraper <br />-Push dozer <br />Cost Bra <br />Support equipment -Load area : <br />-Dump area : <br />Road maintenance -Motor grader <br />-Water truck <br />uipment Description <br />Shift basis : 2 per day <br />t 637G w/push-pull <br />t DI IR - 11 SU (2005) <br />t D! 1R - 11 SU (2005) <br />T 16H <br />ter Tanker, 5, 000 Gal. <br />>akdown : Scraper Work Team , <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br /> <br />Import data filename : <br />scraper2 <br />NA <br />dozer <br />dozer <br />g <br />rader <br />misctruk <br />% Utilization-machine : 100 NA 50 50 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour $66,56 $95.90 $95.90 $34.26 $14.10 <br />Operating cost/hour $112.29 $112.29 $15.88 $8.68 <br />Ripper op. cost/hour g g $0.00 $0.00 $000 NA <br />Operator cost/hour $32.93 $32.93 $24.62 $34.09 <br />Unit subtotals NA $241.12 $24112 $74.76 $87 <br />Number of units 1 1 1 1 <br />Group subtotals : Work : $539.04 Support: $482.25 Maintenance : $131.62 <br />Total work team cost/hour : $1,152.91 <br />. ..: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 72,742 CCY factor : 1.125 volume : 81,835 LCY <br />sheet 1 of 2 <br />Source of quantity take-off : Permit Map 10B <br />Source of estimated swell factor : Caterpillar Handbook Edition