Laserfiche WebLink
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Regrade Middle Pyeatt #3 Pond <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2: I-sha k ripper <br />volume : 5,178 CCY <br />Source of estimated volume: 5178 <br />Source of estimated swell factor :ADDe <br />A Table A-3 <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : (user) <br />Average push distance : 125 feet Material consistency : (Cat HB) <br />Unadjusted hourly production : 1,450.0 LCY/hr Dozing method : % (gen.) <br /> Visibility: (avg.) <br />Material consistency description : Job efficiency : 0.83 shiff/day) <br />Compacted rill or embankment Spoil pile : (fnd-rf) <br /> Push gradient : 1.07 (Cat HB) <br />Average push gradient : 3.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,450 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.47 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 683.50 LCY/hr <br /> Adjusted fleet production : 683.50 LCY/hr <br />_ ::...:...:; :.:.. <br />JOB TIME AND COST ......::... <br />Fleet size : 1 Dozer(s) Total job time : 8.52 Hours <br />Unit cost : $0.395 /LCY Total job cost : $2,303 <br /> <br />factor : 1.125 volume : 5,825 LCY