My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-11_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-11_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:16 PM
Creation date
12/24/2008 2:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
12/11/2007
Doc Name
Adequacy Concerns
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Regrade Middle Pyeatt #3 Pond <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2: I-sha k ripper <br />volume : 5,178 CCY <br />Source of estimated volume: 5178 <br />Source of estimated swell factor :ADDe <br />A Table A-3 <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : (user) <br />Average push distance : 125 feet Material consistency : (Cat HB) <br />Unadjusted hourly production : 1,450.0 LCY/hr Dozing method : % (gen.) <br /> Visibility: (avg.) <br />Material consistency description : Job efficiency : 0.83 shiff/day) <br />Compacted rill or embankment Spoil pile : (fnd-rf) <br /> Push gradient : 1.07 (Cat HB) <br />Average push gradient : 3.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,450 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.47 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 683.50 LCY/hr <br /> Adjusted fleet production : 683.50 LCY/hr <br />_ ::...:...:; :.:.. <br />JOB TIME AND COST ......::... <br />Fleet size : 1 Dozer(s) Total job time : 8.52 Hours <br />Unit cost : $0.395 /LCY Total job cost : $2,303 <br /> <br />factor : 1.125 volume : 5,825 LCY
The URL can be used to link to this page
Your browser does not support the video tag.