Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />Task #: 132 State : Colorado Permitrob #: C-1981-010 <br />Date : 12/07/2007 County : Moffat Abbreviation : none <br />User : JHB Site : Trapper Mine Filename : C010-132 <br />Permit or other job action : Rn5 <br />Task description :Mobilize and demobilize <br />EQUIPMENT TRANSPORT RIG COST <br />Truck tractor description <br />Truck trailer description <br />NON-ROADABLE EQUIPMENT <br />from Hayden <br />Shift basis : 1 per day <br />Cost data source : CRG Data <br />Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership cost/hour : $23.32 $25.78 $31.45 <br />Operating cost/hour : $30.29 $31.74 $35.14 <br />Operator cost/hour : $27.40 $27.40 $27.40 <br />Helper cost/hour : $0.00 $25.15 $25.15 <br />Total Unit Cost/hour : $81.01 $110.07 $119.13 <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D11R- 11SU 141.99 $111.47 $119.13 8 $1,844.76 $953.04 $0.00 <br />-Cat D10R - 10SU 83.38 $60.00 $119.13 4 $716.51 $476.52 $0.00 <br />-Cat 637G w/push pull 59.08 $76.44 $119.13 10 $1,955.67 $1,191.30 $0.00 <br />-CAT 16H 27.28 $50.36 $110.07 1 $160.43 $110.07 $0.00 <br />-Light plant, 30 ft. tower, 4 li 1.46 $5.26 $81.01 4 $345.06 $324.04 $0.00 <br />-ATLAS COPCO DMM3, 12 76.75 $234.07 $119.13 1 $353.20 $119.13 $0.00 <br />-Grove RT640E 37.50 $37.46 $110.07 1 $147.53 $110.07 $0.00 <br />-REEDRILL SK5AD, 7.0 in. 26.50 $52.01 $110.07 1 $162.08 $110.07 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $5,685.26 $3,394.24 $0.00