My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-11_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-11_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:16 PM
Creation date
12/24/2008 2:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
12/11/2007
Doc Name
Adequacy Concerns
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />DIRECT COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br /> Direct costs of tasks <br />101 -Backfill West Ash Disposal Site dozer 8 94.3 $258,682 <br />128 -Cast Blast F Pit dipline highwa0 (805, 556 cy, table 1.4-2) blasting 1 341.7 $519,659 <br />103 -Backfill Pit DIE-no ash r dozer 4 567.3 $777,745 <br />104 -Backfill F Dppline Pit ? dozer 4 405.6 $556,069 <br />105 -Backfill East F (Z) pit ? dozer 4 139.1 $205,372 <br />106 -Backfill & grade additional 13.5 acres Z-dip pit (prev. task 901) ? dozer 4 213.6 $314,018 <br />107 -Backfill Gdip pit (prev. TR96 tasks 130 & 131) dozer 6 283.5 $627,699 <br />110 -Backfill & regrade EastA pit -- dozer 4 171.2 $234,806 <br />112 -Seal 16 boreholes (East panel slide invest. MR212) borehole 1 64.0 $16,390 <br />116 -Backfill & grade N end of East Panel Slide dozer 6 364.8 $804,445 <br />131 -Backfill Ash pit dozer 2 77.9 $57,416 <br />127 -Cast blast N end pit D blasting 2 702.7 $1,098,266 <br />120 -Seed Apit, Range C&B (268.3 ac.) revege 1 268.3 $168,993 <br />126 -Seed H-pit, 207.1 acres (77.9 ac. removed due to AP SL7) revege 2 103.5 $64,738 <br /> <br />129 -Backfill East F (Z) pit highwall (prev. calc. as cast-blast),--' dozer 4 31.9 $44,146 <br />130 -Backfill G dip pit (post-slide) dozer 4 353.2 $519,120 <br /> <br />133 -Seal water monitoring boreholes borehole 1 80.0 $54,739 <br />117 -Seed D-pit Range A-B revege 2 310.2 $433,076 <br />250 -Cast blast G-test pit blasting 1 71.1 $54,123 <br />119 -Seed F-pit Range A-B revege 2 243.0 $306,115 <br /> <br />121 -Seed Z -pit Range A-B revege 2 199.2 $251,002 <br />122 -re-seed Cropland revege 1 185.5 $32,488 <br />123 -Seed G-pit Range A-B revege 2 150.0 $188,960 <br />124 -Seed C-pit Range C revege 1 45.1 $14,098 <br />125 -Seed A-pit Range C revege 1 55.1 $17,224 <br />134 -Seal monitoring wells borehole 1 80.0 $13,030 <br />135 -Regrade Coyote Pond dozer 3 451.5 $366,791 <br />- <br />146 -Regrade Midle Pyeatt#1 pond dozer 1 3.7 $1,012 <br />147 -Regrade Middle Pyeatt #2 pond dozer 1 5.8 $1,583 <br />148 -Regrade Middle pyeatt #3 pond dozer 1 8.5119 $2,303 <br />150 -Demolish & dispose of structures demolish 4 160.0 $1,116,796 <br />134 -Seal monitoring wells borehole 2 85.0 $13,158 <br />132 -Mobilization/demobilization of equipment mobilize 29 4.2 $21,649 <br /> <br />SUBTOTALS : 6,321.5 $9,155,711
The URL can be used to link to this page
Your browser does not support the video tag.