Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 105 State : Colorado PermiUjob# : C1981-010 <br />Date <br />User <br />1112612007 <br />JHB <br />County : Moffat <br />Site : Trapper Mine <br />Abbreviation : none <br />Filename : C010-105 <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Backfill East F (Z) pit <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11R - 11 SU (2005) Horsepower : 850 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 2 per day <br />Attachment no. 2 :1-shank ripper <br />Data source : (CRG) <br />volume : 735,713 LCY factor : NA volume : 735,713 LCY <br /> <br />Source of estimated volume :Appendix A Table 1.4-2 <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.85 (user) <br />Average push distance : 191 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 1,564.6 LCY/hr Dozing method : 1.15 (user) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.81 (2 shifts/day) <br />Partly consolidated stockpile Spoil pile : 0.90 (ssd-fc) <br /> Push gradient : 1.16 (Cat HB) <br />Average push gradient : 7.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,000 feet Material weight : 0.93 (user) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,475 Ibs/LCY Net correction : 0.84 <br />Weight description : <br />USER-PROVIDED WEIGHT DATA Adjusted unit production : 1321.80 LCY/hr <br /> Adjusted fleet production : 5,287.19 LCY/hr <br /> <br />.. .::. .... .... <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 139.15 Hours <br />Unit cost : $0.279 /LCY Total job cost : $205,372 <br />