Laserfiche WebLink
7 (Form 2- Public) <br />7. List the seed mixture to be used in the re-establishment of vegetation. See the attached seed mixture calculation to obtain <br />PLS/acre. For assistance with formulating seed mixtures and rates, contact the local NRCS if on private land, BLMJ,SFS if <br />on public land or State Land Board if on state land. <br />*** See attached Exhibit D <br />A. Provide plant name and seeding rate <br />Plant Name <br />Seeding Rate (PLS/acre) <br />B. Describe the method for seed bed preparation, and application method for grass/forb seeding: <br />Seed bed preparation will include scarifying and broad cast seeding of approved mix. <br />V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br />1.. Reclamation measures shall be fulfilled in a. timely manner and completed within five (5) years of completion. of prospecting <br />activities. <br />2. The prospecting operations described in this Notice will be conducted in such a manner as to minimize surface disturbances. <br />In addition to the measures required in Rule 5, precautions to be taken include: <br />A. Confinement of operations to areas near existing roads or trails, where practicable. Existing roads which are to remain. as <br />permanent roads after prospecting activities are completed shall be left in a condition equal to or better than the pre- <br />prospecting condition; <br />B. Drilling shall be conducted i.rt such a way as to prevent cuttings and fluids tiom directly entering any dry or flowing <br />stream channel. Drill cuttings must be spread to a depth no greater than one-half (1!2) inch or buried in an approved. <br />disposal pit;