West Elk Mine C-1980-007 <br />Lone Pine Gulch Bond Amount <br />n <br />042 Seal Mine Entries (Lone Pine Portals) <br />4 4c Demolish and Remove All Structures 20 $ 11,474.00 <br />44d _ Demolish and Remove All Structures 60 $ 51,835.00 <br />44e iDemolish and Remove All Structures 30 $ 15,791.00 <br />050 Rip Substation Road _ 0.1 $ 21.00 <br />051 -_}Regrade Main Access Road to Substation 2.241 $ 1,587.00 <br />072 Backfill Lone Pine Gulch Fan Bench 63.57[$ 44,972.00 <br />073 !Rip Lone Pine Gulch Fan Pad and Staging Area 1.08; $ 804.00 <br />087 Reconstruct Road Through Lone Pine Gulch Fan Bench 0.24; $ 169.00 <br />08_8 Rip Road Section to Be Reclaimed at Lone Pine Fan 0.18 $ 134.00 <br />095 Backfill Road Section to Be Reclaimed at Lone Pine Gulch 0.24 $ 169.00 <br />096 Haul Material to Backfill Lone Pine Gulch Portals 21.22; $ 11,340.00 <br />157 Haul Substation Backfill Material 9.461$ 5,869.00 <br />Total Direct Costs 258.33 $ 164,833.00 <br />t- <br />INDIRECT COSTS <br />Liability Insurance at 1.55% of Direct Costs 2,554.91 <br />Performance Bond at 1.05% of Direct Costs $ 1,730.75 <br />_ Job Superintendant (50% of total Job hours at $35.00/hour) $ 4,520.78 <br />Profit at 10.00% of Direct Costs $ 16,483.30 <br />-- }Total Overhead and Profit - $ 25,289.73 <br />}Contract Amount (Direct Costs + Overhead and Profit) $ 190,122.73 <br />-- Engineering Work and/or Contract/Bid Preparation at 4.25% of Contract$ 8,080.22 <br />Reclamation Management and/or Administration at 3.25% of Contract $ 6,178.99 <br />TOTAL BOND AMOUNT $ 204,381.94 <br />?Gof, <br />SL- 2 a' -Z2?G25./G <br />jrs Page 1 10/6/2005