My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-10-06_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2005-10-06_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:17 PM
Creation date
12/23/2008 3:34:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
10/6/2005
Doc Name
Review Memo of Thermal Event Bond Amounts
From
Jim Stark
To
Dan Hernandez
Type & Sequence
SL1
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine C-1980-007 <br />Lone Pine Gulch Bond Amount <br />n <br />042 Seal Mine Entries (Lone Pine Portals) <br />4 4c Demolish and Remove All Structures 20 $ 11,474.00 <br />44d _ Demolish and Remove All Structures 60 $ 51,835.00 <br />44e iDemolish and Remove All Structures 30 $ 15,791.00 <br />050 Rip Substation Road _ 0.1 $ 21.00 <br />051 -_}Regrade Main Access Road to Substation 2.241 $ 1,587.00 <br />072 Backfill Lone Pine Gulch Fan Bench 63.57[$ 44,972.00 <br />073 !Rip Lone Pine Gulch Fan Pad and Staging Area 1.08; $ 804.00 <br />087 Reconstruct Road Through Lone Pine Gulch Fan Bench 0.24; $ 169.00 <br />08_8 Rip Road Section to Be Reclaimed at Lone Pine Fan 0.18 $ 134.00 <br />095 Backfill Road Section to Be Reclaimed at Lone Pine Gulch 0.24 $ 169.00 <br />096 Haul Material to Backfill Lone Pine Gulch Portals 21.22; $ 11,340.00 <br />157 Haul Substation Backfill Material 9.461$ 5,869.00 <br />Total Direct Costs 258.33 $ 164,833.00 <br />t- <br />INDIRECT COSTS <br />Liability Insurance at 1.55% of Direct Costs 2,554.91 <br />Performance Bond at 1.05% of Direct Costs $ 1,730.75 <br />_ Job Superintendant (50% of total Job hours at $35.00/hour) $ 4,520.78 <br />Profit at 10.00% of Direct Costs $ 16,483.30 <br />-- }Total Overhead and Profit - $ 25,289.73 <br />}Contract Amount (Direct Costs + Overhead and Profit) $ 190,122.73 <br />-- Engineering Work and/or Contract/Bid Preparation at 4.25% of Contract$ 8,080.22 <br />Reclamation Management and/or Administration at 3.25% of Contract $ 6,178.99 <br />TOTAL BOND AMOUNT $ 204,381.94 <br />?Gof, <br />SL- 2 a' -Z2?G25./G <br />jrs Page 1 10/6/2005
The URL can be used to link to this page
Your browser does not support the video tag.