III. COMMENTS -COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> This was a Partial Inspection of the Bowie No. 1 Mine, conducted by Marcia Talvitie of the DRMS on 03 <br /> December 2008. Basil Bear represented the operator, Bowie Resources LLC, during the inspection. The <br /> weather was partly cloudy, windy and cold. <br /> R.O.M. Pile <br /> Reclamation appears to be substantially complete at the site. Work was under way to excavate the fill <br /> material covering the culvert pipe that has carried Stevens Creek beneath the access road. Once the <br /> culvert is removed and the stream channel is reclaimed, access to the ROM pile will no longer be <br /> possible from the east. <br /> Equipment tracks observed criss-crossing the area during the November inspection have been <br /> obliterated. <br /> West Mine <br /> Ponds W-1 and W-2 were dry. The reclaimed slope was bare of snow, although snow could be seen at <br /> surrounding higher elevations. <br /> Well Field <br /> The topsoiled area had been recently hydro-seeded and -mulched. A thin layer of snow covered <br /> much of the area. <br /> Loadout Area <br /> Approximately 60 empty, overturned barrels have been placed near the RR track in the pond area. The <br /> barrels have not been observed during previous inspections. There was no visible petroleum <br /> contamination of the soils. The source of the barrels is unknown. <br /> Trucks and equipment owned by a drilling contractor were stored on the shop level. One trailer held a <br /> portable petroleum storage tank that appeared to have its own secondary containment. The upper <br /> levels continue to be used to store various types of equipment and material. <br /> East Mine <br /> Grading and backfill of the east bench above the former Crushing / Screening bench was nearing <br /> completion. The contractor and BRL are still working through the final material balance (cut/fill) for the <br /> site. <br /> The Shop and Warehouse bench continues to be used for the contractor's staging area. <br /> This completes the December 2008 inspection report for the Bowie No. 1 Mine. <br /> Bowie No. 1 Mine C-1981-038 03-Dec-2008 <br />