Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />4 <br />1313 Sherman St., Room 215 <br />CLORA <br />of <br />° <br />Denver, Colorado 80203 RECEIVED i <br />ON <br />D <br />Phone: (303) 866-3567 RECLAMATION <br />FAX: (303) 832-8106 / <br />DEC 2 2 2008 MINING <br /> <br />December 19, 2008 <br />Division of Reclamation, SAFETY <br /> Mining and Safety <br />Ms. Cindi Bryns Bill Ritter, Jr. <br />Natural Soda, Inc. Governor <br />3200 RBC Road 31 Harris D. Sherman <br />Rifle, CO 81650 Executive Director <br /> Ronald W. Cattany <br /> Division Director <br /> Natural Resource Trustee <br />Re: Natural Soda, Inc., Nacholite Projec ermit N&M-1983-19 , Preliminary Adequacy Review of Technical <br />Revision No. 26 application, TR-26. <br />Dear Ms. Byrns, <br />The Division of Reclamation, Mining and Safety (DRMS) has reviewed the application for a technical revision to <br />the above referenced 112 permit. The purpose of the technical revision is to add one core hole that will ultimately <br />be converted into either a dissolution surface aquifer monitor well or a subsidence monitor well, two additional <br />injection wells, two additional recovery wells and 6.61 acres additional surface disturbance for well pads <br />associated with the proposed wells. A review of the application has revealed a few issues and clarifications to <br />address. <br />1) Please describe what methods will be used to prevent cross contamination from one aquifer to another <br />assuming that multiple aquifers will be drilled through during well construction. Please include specific <br />details that describe each step of the well construction. <br />2) Please clarify if all access points are included in the proposed overall surface disturbance. <br />The technical revision cannot be approved until the issues are adequately addressed. Please submit a response to <br />the issues as soon as possible but no later than December 29, 2008, so the decision date of January 5, 2009 can be <br />met. If your response, or a written request for an extension of the decision date, is not received by December 29, <br />2008 then the request for the modification may be denied. <br />If you need additional information, please contact me at the Division of Reclamation, Mining and Safety, Grand <br />Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction, Colorado 81501, telephone no. 970.241.2042. <br />Sincerely, <br />Travis Marshall <br />Environmental Protection Specialist <br />Cc: Paul Daggett, BLM White River Field Office <br />Office of Office of <br />Mined Land Reclamation Denver • Grand JunctioDurango Active and Inactive Mines