Laserfiche WebLink
Nov. 28, nothing done <br />Dec. 1., had to call dan to find out time of meeting, trying to get over the pass, it was <br />open the night before, will call for meeting this p.m. or a.m. tomorrow <br />Dec. 2., Meeting with Dan Knox at pit and east wetlands. They will use cat on slopes in <br />the lake for the weeds. Tamarisk will be removed. Top soil will be put where needed. <br />Will replace trees, and shrubs, will repair sprinkling system, will add on to sprinkling <br />system on west end of lake. Fences to be started asap. <br />Wetlands by the scale house are still going to be filled in as soon as possible as EPA or <br />Army Corp. allows. They will convey material from North Bank to fill wet lands. <br />Fencing east of scale house to be done soon. <br />They will fill lake now and finish lake slopes and remove tamarisk as soon as possible. <br />Wetlands to east of ranch - explained to Dan and operator how this was irrigated. They <br />dug up pit run that needed covered with top soil. Discussed rip-rap along Mamm Creek. <br />I had previously discussed with Mike Prelim that the east side of Mamm Creek would be <br />rip-rapped.. Steel post need to be removed as they are a hazard to livestock. Move <br />excess dirt to the north where it came out of. Remove fence on the north to do that. <br />Burned area near conveyor - remove dead trees, level, spray weeds then reseed. Drop <br />trees and saw up. Can use our gate to east to access r.o.w. of belt. All brush and trash to <br />be burned. <br />Quote from Dan Know: <br />" Jim, this is top priority for me - the relamation of your property" <br />Dec. 7, nothing done this past week in the reclamation. <br />Dec. 8-18, "0" done on reclamation. Called Dan Knox on 12-17 and asked if anything <br />had been done on reclamation. He said "Got all the tamarisk pulled and will have a <br />trackhoe in on Monday of next week to finish the slopes on the lake. <br />Dec. 12, called LaFarge attorney. Secretary said he was busy so left a message saying <br />they were late on payment of $2500 fro scale house land rent and late on production <br />check and told them we received a printout of production but no check. <br />Pump was removed from the lake. <br />Also told attorney that is was 3 more weeks with nothing done since my last meeting with <br />a representative of LaFarge.