was used to correct the slope on the lake instead. October and November the lake <br />is shrinking because of the product on the slopes. Called Dan and told him to go <br />back and remove the old culvert, pipe, belting and trash from the river that was <br />placed in our lake. The area at the northwest corner of the lake has been filled in <br />to an additional 30' inside the lake. <br />No matter what we try it all falls on deaf or indifferent ears. <br />2. Irrigation system: Was installed when Mike prehm was employed by LaFarge. <br />The system has never been checked out because the pump was wired backwards <br />and two summers have passed with NO irrigation taking place. Summer/Fall <br />of '08 the system has had heavy equipment driven over it in its entirety. A Bill of <br />Sale will not suffice until the system is checked out and shown to work correctly <br />for a sustained period of time. <br />3. Fencing: LaFarge has received bids to do fencing but no fencing has been done. <br />The delay was requested so that the fencing was not destroyed while the wetlands <br />were filled in. The fencing west of the well pad was agreed with Dan to be <br />fenced immediately. Nothing was been done. Please commence with the <br />installation of the fence. We will make the top rail available immediately as <br />indicated previously. <br />4. Landscaping: 90% of the existing trees and shrubs planted by a contractor of <br />outbwe were uildingstold <br />Of LaFazge's choice are dead?ceon concealed from oour home replaced? <br />the conveyor equipment would <br />5. Wetlands: We were told by LaFazge representatives that the mitigation credits <br />That have been purchased would be used to clean up the creek destroyed wetlands <br />on the east boundary of our property and to fill in the wetlands close to the scale <br />house. Lengthy discussions included the conversation of leaving the fencing until <br />the wetlands were filled in. <br />Further, it has been necessary to call LaFarge to request payment of eve quarterly <br />payment that has been owed to us since production W t into meet and the lease of the <br />grounds under the scale house and access roadway <br />the week before our granddaughter's wedding while constructing the <br />Further, In August <br />conveyor, a welder caused a fire that burned a sizeable area. Eric phone after the <br />wedding to tell us of the fire and to say that <br />? they planned to do, not asked what we to LaFarge would do whatever was necessary take care of this. Last week we were <br />would like to see done. <br />Whether we have self help or not, every attempt has been made by the Snyders to address <br />our concerns. We are the landowners and we live very close so we are the MOST <br />affected by the actions and business of LaFarge. We apologize for our behavior. It <br />comes from our frustration in never seeing remedies or completion which were