Laserfiche WebLink
-4- <br />12. Primary future (Post-mining-) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />X Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife FIabitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />13. Primarv present land use (check one): <br />__ Cropland(CR) Pastureland(PL) <br />X Rangeland(RL) Forestry{FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(bVR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g, truck/shovel): SCRAPER, LOADER, TRUCKS <br />15. On Site Processing-: X Crushing/Screening <br />13.1 Briefly explain mining method (e.g. trucktshovel): DOZER, RUBBER TIRED LOADERS SHALL BE USED TO <br />EXCAVATE MATERIAL AND FEED CRUSHER. PORTABLE ASPHALT PLANTS MAY BE PRESENT INTERMITTENT' <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />N/A <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s).