Laserfiche WebLink
- 41T CONSTj? <br />10V %Iht <br />4 T ?''t>?J, <br />Chi <br />7040 W. Hwy. 160 Atamosa, 00.81101 (719) 5896671 <br />EXHIBIT L <br />RECLAMATION COSTS <br />These reclamation costs assume that all stockpiles are removed from the pit floor. <br />The side slopes are set at no steeper than 3H to 1 V during the mining operation. <br />Once the toe of the pit wall has reached its point the slope is shaped accordingly. <br />Please see the areas marked on the reclamation cost map for a better <br />understanding of the finished area. Topsoil will only be required in area shown. The <br />balance of the side slopes will have topsoil applied <br />Listed is a table of our project reclamation costs for Phase 1 <br />ITEM NO DESCRIPTION QUANITY UNIT UNIT <br />RATE <br />AMOUNT <br />1 RIP PIT FLOOR FOR <br />COMPACTION <br />13.88 <br />ACRES <br />$200.00 <br />$2,776.00 <br />2 SPREAD TOPSOIL 3" <br />THICK ON SLOPES <br />AND PIT FLOOR <br />AVG HAUL < 700 LF <br />13.88 <br /> <br />5597.80 <br />ACRES <br /> <br />CUBIC YDS <br /> <br /> <br />1.50 <br /> <br /> <br />8,396.70 <br />3 SEEDING 13.88 ACRES $300.00 $4,164.00 <br /> <br /> SUBTOTAL $15,336.70 <br /> ADD PROFIT & <br />OVERHEAD <br />10% <br />$1,533.67 <br /> TOTAL $13,803.03 <br />Listed is a table of our project reclamation costs for Phase 2 <br />ITEM NO DESCRIPTION QUANITY UNIT UNIT <br />RATE <br />AMOUNT <br />1 FLOOR RIP PIT FOR <br />COMPACTION <br />9.42 <br />ACRES <br />$200.00 <br />$1,884.00 <br />2 SPREAD TOPSOIL 3" <br />THICK ON SLOPES <br />AND PIT FLOOR <br />AVG HAUL < 700 LF <br />g.42 <br /> <br />3799.09 <br />ACRES <br /> <br />CUBIC YIDS <br /> <br /> <br />1.50 <br /> <br /> <br />5,698.64 <br />3 SEEDING 9.42 ACRES $300.00 $2,826.00 <br /> <br /> SUBTOTAL $10,408.64 <br /> ADD PROFIT & <br />OVERHEAD <br />10% <br />$1,040.86 <br /> TOTAL $9,367.70