My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-22_PERMIT FILE - M2008085
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008085
>
2008-12-22_PERMIT FILE - M2008085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:10 PM
Creation date
12/22/2008 3:04:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008085
IBM Index Class Name
PERMIT FILE
Doc Date
12/22/2008
Doc Name
New 112c application
From
Asphalt Constructors, Inc.
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D 1 of 2 <br />CONSTR& <br />% <br />7040 W. Hwy. 160 Alamoss, Co. 81101 (719)589-W1 <br />EXHIBIT D <br />MINING PLAN <br />(A) Mining will start by removing the topsoil and stockpiling so it will be <br />available for reclamation. Mining will be performed by using standard <br />crushing equipment. Jaw and cone crushers along with screening <br />plants, ground and stacking conveyors will be used to process the pit <br />run material. 100% of the material obtained from the pit wall can be <br />processed through our equipment. No waste piles will be generated <br />from the mining operation. <br />(B) Earthmoving shall be accomplished using dozers or scrapers to move <br />the material and wheel loaders to feed the crusher bins, or load pit run <br />directly into over-the-road trucks. <br />(C) No water diversion or impoundment's are necessary for this operation. <br />(D) The total area to be mined is 23.30 acres. The Phase I area will be a <br />disturbance of 13.88 acres. Phase II will have a disturbance of 9.42 <br />acres. One to five acres would be in process at any one time. <br />(E). There is no definite timetable at which this project will be finished. <br />The amount of material that is available could last many years depending <br />on local market conditions and projects that are available to us. <br />i. As mining progresses the side slopes will be formed. Topsoil will be <br />redistributed along 3H to 1V side slopes after the initial pit development <br />which would be about two years. Topsoil shall be spread a minimum of <br />once per year to affected areas. <br />ii. The size of Phase I reclamation will be at 13.88 acres and Phase II <br />reclamation will be at 9.42 acres <br />iii. The sequence of reclamation will be : <br />1. Lay slopes back during extraction at a 3H:1 V slope. <br />2. Distribute topsoil within one year. <br />3. Seed following overburden and topsoil distribution, once a sizeable <br />area - 2-3 acres is ready for seed.
The URL can be used to link to this page
Your browser does not support the video tag.