Laserfiche WebLink
<br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />May 2008 Monthly Report <br />Page 3 <br />Table 2 -May 2008 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P12 5/28/08 41.10 41.71 0.61 <br />P13 5/28/08 40.89 41.34 0.45 <br />P14 5/28/08 D 41.24 0.00 <br />P15 5/28/08 D 41.10 0.00 <br />Table 3 below provides the calendar year 2008 sludge management for the San Luis site. <br />Table 3 - Water Treatment Plant Sludge Management Year to Date. <br />Date Quantity Sludge Management <br />October 2007 Sludge transferred from Pond #3 to drying <br />ad. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0798 or Mr. Bill Lyle (303) 324-2630 or (970) 325-4482. <br />Coordinator III <br />Cc: Bill Lyle <br />File