My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-13_REVISION - M2000098
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000098
>
2008-06-13_REVISION - M2000098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:18 PM
Creation date
12/22/2008 1:17:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000098
IBM Index Class Name
REVISION
Doc Date
6/13/2008
Doc Name
Adequacy letter response
From
Colorado Lime Co.
To
DRMS
Type & Sequence
TR1
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adk <br />UNITED STATES LIME & MINERALS INC. <br />//¦¦?\ <br />,'A?? r COLORADO LIME CO. <br />Annnn\ 1468 HIGHWAY 50 <br />DELTA, Co 81416 <br />(970) 874-8300 <br />June 13, 2008 <br />Department of Natural Resources <br />-? Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 L <br />Attention: Allen Sorenson <br />RE: Monarch Quarry, Permit M-2000-098, Tech Revision 01 Adequacy Letter ('e S10 <br />bK 5 ?/ <br />Dear Allen: <br />This letter is in response DRMS's adequacy letter dated January 15, 2008, concerning Colorado Lime's <br />application for Tech Revision #01. <br />The attached plan map and detail and cross section sketches address the concerns raised by DRMS: <br />1- The east access road is nominally 20' wide, with a slight slope towards the outside ditch and safety <br />berm. This configuration channels the runoff from the road surface into the west sediment pond, as <br />shown on the drawings by the "drainage direction" arrows. This road will be relocatedto the east, <br />within the disturbed active mining area, several times over the life of the mine. This road will be <br />removed at final reclamation and has no effect on the approved final reclamation configuration. <br />2. The details sketches and cross sections provide the additional descriptions and designs requested for <br />the west sediment pond. These drawings supplement the design data originally submitted in October <br />2007. Construction of the loader access ramp for cleanout of the pond and the overflow structure <br />will be completed as soon as possible this summer. <br />Please contact me at the number shown above or by email at trace unnna uslm com if you have any questions, <br />concerns or need additional information. <br />Respectfully, <br />Tracy Gunn, General Manager <br />Colorado Lime Company <br />r IAjdLs.
The URL can be used to link to this page
Your browser does not support the video tag.