My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-05_REVISION - M2000049
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000049
>
2008-06-05_REVISION - M2000049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:01:39 PM
Creation date
12/22/2008 1:16:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000049
IBM Index Class Name
Revision
Doc Date
6/5/2008
Doc Name
Cost summary form
From
DRMS
To
Angie Pit
Type & Sequence
AM2
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />` BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 006 State : Colorado Permit/job# : M-2000-049 <br />Date <br />User <br />06/05/2008 <br />KAP <br />County :Montrose <br />Site :Angie Pit <br />Abbreviation :none <br />Filename : M049-006 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action :Amendment <br />Task description : Spread opsoil hauled from Phase i Stockpile <br />77 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series /! - 8SU (200: <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 310 <br />Shiftbasis : 1 per day <br />volume : 7,800 LCY factor : NA volume: 7,800 LCY <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor : NA <br />77 <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 65 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 1,170.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Loose stockpile Spoil pile: 0.80 (fnd-ro <br /> Push gradient : 1.52 (Cat HB) <br />Average push gradient : 25.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,570 feet Material weight : 0.82 (CatHB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,800 Ibs/LCY Net correction : 0.74 <br />Weight description <br />Clay - Natural bed Adjusted unit production : 871.16 LCY/hr <br /> Adjusted fleet production : 871.16 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 8.95 Hours <br />Unit cost : $0.192 /LCY Total job cost : $1,496
The URL can be used to link to this page
Your browser does not support the video tag.