My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-05_REVISION - M2000049
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000049
>
2008-06-05_REVISION - M2000049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:01:39 PM
Creation date
12/22/2008 1:16:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000049
IBM Index Class Name
Revision
Doc Date
6/5/2008
Doc Name
Cost summary form
From
DRMS
To
Angie Pit
Type & Sequence
AM2
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Agency or organ <br />Task #: 005 <br />Date : 0610512008 <br />User: KAP <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />ization name : Colorado Division Of Reclalmation Mining And Safet <br />State : Colorado Permit/job #: M-2000-049 <br />_ County :Montrose Abbreviation :none <br />Site :Angie Pit Filename : M649-005 <br />sheet 1 of 2 <br />Permit or other job action :Amendment <br />Task description : Load and haul topsoil stockpile from Phase I to Phase 11 <br />XXX <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Equipment Description <br />Truck/loader team -Truck : Generic 12-18 cy, 6x4 <br />-Loader : CAT 966G (2002) <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />% Utilization-machine : 90 100 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $14.80 $29.49 NA NA NA NA <br />Operating cost/hour : $41.71 $40.39 NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $21.72 $32.78 NA NA NA NA <br />Unit subtotals : $78.22 $102.66 NA NA NA NA <br />Number of units : 4 1 0 0 0 0 <br />Group subtotals : Work : $415.55 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $415.55 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 7,800 LCY factor : NA volume : 7.800 LCY <br />Source of quantity take-off : Reclamation Plan <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Rated payload <br />Payload capacity <br />50,300 pounds Average volume <br />17.96 LCY Adjusted volume': <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />12.00 LCY <br />18.00 LCY <br />15.00 LCY <br />17.96 LCY <br />16.62 LCY <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 6,570 <br />Rated capacity (nom. heaped) : 4.750 LCY Truck Loader Source <br />Descr.:Loose material - 1"and over (85 - 90%) Altitude adj.: 1.000 6.920 (Cat HB) <br />Bucket fill factor : 0.875 Job efficiency : 0.830, 0.830 (1 shift/day) <br />Adjusted bucket capacity : 4.156 LCY Net correction : 0.830 0.764
The URL can be used to link to this page
Your browser does not support the video tag.