Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organi zation name : Colorado Division Of Reclamation Mining And Safety <br />Task #: 008 State : Colorado Permit/job #: M-2000-049 <br />Date : 0610512008 County :Montrose Abbreviation :none <br />User : KAP Site :Angie Pit Filename :M049-008 <br />Permit or other job action : Amendment <br />Task description : Mobilize/Demobilize <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br /> Operating cost/hour : $44.38 $46.13 $50.07 <br /> Operator cost/hour : $27.66 $27.66 $27.66 <br /> Helper cost/hour : $0.00 $25.39 $25.39 <br /> Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description . Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11 - 8SU (20 52.55 $50.32 $125.45 1 $175.77 $125.45 $0.00 <br />-CAT 966G (2002) 25.10 $29.49 $117.55 1 $147.04 $117.55 $0.00 <br />-Revegetation equipment 20.00 $20.00 $88.67 2 $217.34 $177.34 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $540.15 I $420.34 $0.00