Laserfiche WebLink
4M, <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION a000 <br />Date : 05-Jun-2008 Permit or job no. M-3909$=049 Site :Angie Pit <br />User : KAP Abbreviation : none State : Colorado <br />Filename : M049-000 County :Montrose <br />Agency or organization name : Colorado Divison Of Reclamation Mining And Safety <br />Permit or job action :Amendment <br />I AJK LIJ I IUIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Strip Topsoil off rest of Phase 11 dozer 1 10.1 $1, 691 <br />002 -Demolish and dispose scale footers demolish 1 $39 <br />003 -Cut and Fill Highwall dozer 1 $1_2,593 <br />004 -Replace Stripped topsoil dozer 1 A :?j: <br />928 <br />005 -Load and Haul topsoil truckl 1 20. 702 <br />006 -Spread hauled topsoil dozer 1 . $1,496 <br />007 -Revegetation revege 2 15.0 $12,982 <br />008 -mobilize mobilize 1 5.2 $2,954 <br /> <br /> <br /> <br /> <br /> <br /> r?. <br /> <br /> ` <br /> vision oI ", <br />Saflekv <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 145.1 $41,385 <br />inciuaes innauon factor aalustment of . NH % TOTAL DIRECT COST * =L $41,385 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $836 <br />Performance bond : 1.05 % of direct total = $435 <br />Job superintendent : 72.58 hrs* ...$/hr. $41.25 total = $2,994 <br />Profit : 10.00 % of direct total = $4,138 <br />* assume net hours = 50% of task hours TOTAL O & P = $8,403 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $49,788 <br />Financial warranty processing (legal/related costs) : 500.00' total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : 4.25 % of cntr. NA total = $2,116 <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $2,489 <br />CONTINGENCY - NA' NA total = NA <br />contingencies accounted for at task level TOTAL INDIRECT COST = $13,508 <br />TOTAL BOND AMOUNT (direct + indirect) _ $54,893