Laserfiche WebLink
xx X: <br />ROADABLE EQUIPMENT sheet 2 o..2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br />-Light Duty Pickup, 4x4, 314 T. $30.93 1 $30.93 $30.93 <br />Subtotals :I $30.93 <br />EQUIPMENT HAUL DISTANCE and TIME ......................................... <br /> Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-wa <br />trav <br />l di <br />t <br /> y <br />e <br />s <br />ance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 0.14 0.14 Total non-roadable mob/demob cost' <br />Return time (hours) = 0.14 0.14 'two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost " <br />Unloading time (hours) = 1.00 NA *t one round trip, no haul rig <br />Subtotals = 2.29 0.29 <br />JOB TIME AND COST <br />Total job time <br />Total job cost : <br />$30.93