Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />19 December 2008 <br />Ms. Jennifer Sekulski <br />Colowyo Coal Company, LP <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />Re: Colowyo Mine C-1981-019 <br />Incompleteness Letter - Technical Revision 77 <br />Dear Ms. Sekulski: <br />COLORADO <br />D I V I S I ON O F <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />The Division has received your 9 December 2008 submittal of Technical Revision 77 - <br />update of the highwall mining area in South Taylor. At this time the Division is deeming <br />the revision incomplete for the reasons listed below. The Division will again review the <br />revision for completeness upon receipt of the requested materials. <br />Colowyo has not provided any updated text describing the specific highwall <br />mining plan for the South Taylor Pit. The information that is provided on <br />Page ST/LW Rule 4 - 29 is basic information that was included with the <br />original submittal of Permit Revision 02. This basic information was <br />provided for the sole purpose of informing the Division that Colowyo was <br />planning on performing highwall mining in the South Taylor Pit at a later <br />date. The understanding at the time of the submittal and approval of Permit <br />Revision 02 was that Colowyo would provide the operational details prior to <br />initiating highwall mining. Since Colowyo is planning on conducting <br />highwall mining in 2009, based on the new Map 23A, Technical Revision 77 <br />is the time and place to provide the operational detail. The detail in the <br />requested text needs to address the performance standards pursuant to Rule <br />4.23.2. Please update this section and submit it to the Division for review. <br />2. As with question 1 above, Colowyo needs to provide more detailed <br />information on Page ST/LW Rule 2 - 129 regarding the proposed highwall <br />mining in the South Taylor Pit. This page (in Volume 12) refers back to <br />Volume 1, page 2.06-8. The text in this section in Volume 1 does not mention <br />any highwall mining in the South Taylor Pit. Please update both of these <br />sections as necessary and submit them to the Division for review. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines