My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-19_REVISION - M1980244 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-12-19_REVISION - M1980244 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:08 PM
Creation date
12/22/2008 8:38:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/19/2008
Doc Name
Cost Model
From
CC&V
To
DRMS
Type & Sequence
TR53
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Footnotes for summary cost table <br />'Assumes heavy grading will be done with conventional D11 dozers with U blades where the push distances are practical <br />2Assumes light grading will be done with a 09 dozer on the backfilled areas in Schist Island / Globe Hill pit areas (rate = 2 hrs/acre) <br />GGrowth Medium Replacement fleet will 623 Scrapers, 14G grader, and 5000 gal water truck <br />'Growth Medium will be spread using a D-9 dozer to a depth of 6 inches <br />5Soil analyses will be run on samples of the reclaimed areas to determine optimum fertilizer rates <br />'Ripping and fertilizing will be conducted on the replaced growth medium using a conventional D4 dozer with a cyclone spreader <br />'Seeding and harrowing will be conducted on all replaced growth medium that is traversible with conventional equipment <br />8Mulching will be conducted using conventional hydro-seeder/hydro-mulcher <br />9Mulching will be conducted using conventional hydro-seeder/hydro-mulcher <br />1OTree planting costs are included under N Cresson Viewshed Conservation Plan costs <br />"Supervisor costs are figured at 25 percent of the total work hours to accomplish the reclamation effort <br />North Cresson Mine Reclamation Costs (2008 <br />(Includes Schist Island and Globe Hill Pits) <br /> Acreage Input Table <br />Pit Number Units Comment <br />Light Grading 92 ac Reclamation Map <br />GM placement 110 ac Reclamation Map <br />North Cresson Mine Backfill Dozer Productivity in Re-contouring <br />Assumptions: For volume calculation assume that 60% of the recountour is for a 315 ft dump height and 40% is for a 250 ft dump height with 3,150 linear ft of recontour. <br />Quantity Comment <br />What is the volume of backfilled rock to be graded? 1,073,333 cu yds <br />What is the weighted average push distance for the dozer? <br />What is the job correction factor for the operator? <br />What is the job correction factor for the material condition? <br />What is the job correction factor for job efficiency? <br />What is the job correction factor for downhill grade pushing? <br />What is the job correction factor for side by side dozing? <br />What is the dozer unit and blade type selected? <br />What is unadjusted production based on push distance? <br />Calculated adjusted production based on job factors = <br />Calculated D11 Dozer hours in grading = <br />Grading and Recontouring Backfilled Areas <br />What is the area to be light graded with a dozer? <br />What is the rate selected for light grading? <br />What dozer will be used for light grading? <br />What is the selected equipment to haul growth medium? <br />How many scrapers will be used? <br />What is the area for growth medium replacement? <br />What is the thickness of growth medium replacement? <br />Calculated quantity of growth medium required = <br />What is quantity/haul distance/productivity from E. Cresson? <br />Similar productivity as Squaw OSA <br />0.75 Average Operator, Cat Hdbk, 33 Ed, pt-42 <br />1.2 Waste rock is loose, Cat Hdbk, 33 Ed, p1-42 <br />0.83 50 minutes operating per hour, Cat Hdbk, 33 Ed, p1-42 <br />12 Assume conservatively 10% grade, Cat Hdbk, 33 Ed, p1-42 <br />1.2 Side by side dozing, Cat Hdbk, 33 Ed, p1-42 <br />D10 U-Blade <br />800 cu yds/hr from Estimated Dozing Prod. Chart, Cat Hdbk, 33 Ed, p1-39 <br />860.5 cu yds/hr calculated <br />1247.27 hours <br />North Cresson Mine Growth Medium Activity <br />Quantity Units Comment <br />92.0 acres measured fr. topo map & air photo <br />2 hrs/acre MDE assumption <br />D9 <br />623 Scrapers <br />110.0 acres <br />0.5 feet <br />88,715 cu yds <br />88,715 cu yds <br />North Cresson Mine Revegetation <br />How many acres will receive fertilizing and ripping simultanesouly with a D4 dozer? <br />How many acres will receive seeding & harrowing simultanesouly with a D4 dozer? <br />How many acres will receive tree planting? Tree planting calculated in Viewshed Conservation Costs <br />'Estimated from the 2008 Growth Medium Stockpile Map <br />2From the Scraper Production Graph <br />MDE assumption <br />Scraper <br />Haul Distance' Productivity2 Hours <br />5,000 feet 148 cy/hr 599.43 <br />110.0 acres <br />110.0 acres <br />- acres MDE (2-25-08) <br />Rev (4-3-08) & (4-11-08) <br />Rev. TJC 11-17-08
The URL can be used to link to this page
Your browser does not support the video tag.