Laserfiche WebLink
• <br />• <br />Mr. Timm Comer <br />December 4, 2008 <br />Page 2 <br />diatreme mass, and will reach the regional groundwater table as intersected by <br />the Carlton Tunnel. <br />• No water will exit the mine permit boundary through the west wall of the Schist <br />Island Mine. <br />Certification <br />The engineering services addressed in this evaluation were performed by Adrian <br />Brown, P.E. The work is based on my knowledge, information,and belief, and has been <br />performed in accordance with applicable standards of practice. This certification is not a <br />guaranty or warranty, expressed or implied. <br /> <br />0