My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-19_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-12-19_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:08 PM
Creation date
12/22/2008 8:37:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/19/2008
Doc Name
Introduction
From
CC&V
To
DRMS
Type & Sequence
TR53
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Introduction to the proposed technical revision to Amendment No. 9 - North Cresson <br />updated backfilling re adinu and reclamation plan <br />Pursuant to Resolution 09-11-08 (28) of the Teller County Commissioners, conditionally <br />approving the Mine Life Extension (Amendment No. 9) Application for a Teller County <br />Mining Development Plan, Paragraph C of this Resolution states: <br />"This Mining Development Plan is conditioned on submittal, and operations in <br />the below described North Cresson Mine Area are conditioned on submittal and <br />approval, of an application for an Amendment of a Mining Development Plan <br />under and pursuant to Section 8. C. of the CCMOD Regulations, revising only the <br />proposed "high wall, " which amendment must satisfy Standard number 7.A.6, <br />Visual Resources. Further, any revisions to the proposed "high wall" shall be <br />included in the Applicant's submittal to the State, which should include financial <br />warranties that insure completion of the "high wall" remediation, and copies of <br />such submittal to the State, along with all other Submittal Requirements in <br />Section 3.D.1, shall be included with the application to Teller County. " <br />In keeping with this resolution, Cripple Creek & Victor Gold Mining Company (CC&V) <br />• has prepared this technical revision of the Amendment No. 9 submittal to update the <br />planning in the Schist Island portion of the North Cresson mining area. <br />Mining activities scheduled in Schist Island portion of North Cresson mining area for <br />approximately 2015 and 2016 (see revised drawing C-5) have been revised to provide for <br />additional overburden backfill placement in the area of the Schist island portion of the <br />North Cresson Mine that was previously shown as a remaining highwall within the City <br />of Cripple Creek view shed. This additional overburden placement during mining will <br />provide for an additional 17.5 acres of surface mine reclamation in this portion of the <br />North Cresson mine. (Total reclaimed acres for this portion of the North Cresson will be <br />adjusted from approximately 92 acres to approximately 109.5 acres.) This additional <br />overburden will be graded to create an additional reclaimable landform that will be <br />blended to the surrounding topography as shown in the revised post-mining topography <br />map (see revised drawing F-1). These regraded slopes will then be covered with a <br />minimum of six inches of growth medium and reseeded in accordance with the approved <br />reclamation plan. Reclamation surety costs to complete this additional regrading, growth <br />medium placement, and revegetation have been included in the updated reclamation <br />surely estimate included in this revised plan. <br />Several minor changes to the Amendment No. 9 approval are needed to complete this <br />revision and are included with this application. A summary of the updated information is <br />provided below:
The URL can be used to link to this page
Your browser does not support the video tag.