My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-19_REVISION - C1996083 (7)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2008-12-19_REVISION - C1996083 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:07 PM
Creation date
12/19/2008 1:31:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
12/19/2008
Doc Name
Proposed Decision and Findings
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
PR11
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following are the active stipulations: <br />Stipulation No. 9 <br />A detailed subsidence study for Terror Creek Reservoir dam (Bruce Park dam) must be completed and <br />approved prior to that time when the projected angle of draw of mining is within one mile of the Bruce <br />Park dam. The study will establish baseline conditions, potential mining-induced seismicity and potential <br />translated effects to the dam. <br />Mining with a projected angle of draw that is within one mile of the Terror Creek Reservoir (Bruce Park <br />dam) will not be approved until all necessary monitoring data, analyses, reports and subsidence control <br />plan details are approved by the Division and it is shown that such mining will not adversely impact the <br />dam. <br />Bowie Resources will submit a technical revision to the permit addressing the investigation, data <br />collection, analysis, and monitoring plan to ensure the safety and integrity of the Terror Creek Reservoir <br />dam (Bruce Park dam). The revision materials will include, but not be limited to, data, a technical report, <br />compliance schedules, a subsidence control plan, a detailed monitoring plan specific to potential <br />seismicity and any other potential impacts induced by longwall mining. The Technical Revision shall <br />address: <br />The results of the drilling program, as referenced in the Colorado Division of Water Resources letter <br />to the Division, dated February 9, 2001, including installation of piezometers or other down-hole <br />instrumentation. <br />2. The results of the seismic investigation and evaluation of the structure, including recommendations <br />for any additional instrumentation. <br />3. The installation of any additional monitoring instrumentation, seismic or otherwise, in accordance <br />with the final instrumentation plan. <br />4. A report of all baseline data and a description of the baseline conditions within a 1 mile radius of the <br />dam. <br />5. A final report and impact analysis prior to anticipated mining with a projected angle of draw <br />that is within one mile of the dam. <br />Stipulation No. 10 <br />Prior to affecting USDA-Forest Service (FS) water rights by mining, the Operator will submit to the <br />Division for approval, a technical revision that includes 1) a revised Map 23, "Water Rights Location" <br />and revised text that describe the FS water rights within the permit and adjacent area, and 2) verification <br />that a court-approved water augmentation plan is in effect for those FS water rights within the permit and <br />adjacent area that may be contaminated, diminished or interrupted by mining. <br />Stipulation No. 24 <br />The elevated conveyor over old state highway 133 and the Fire Mountain Canal that is proposed in <br />Technical Revision No. 45 cannot be constructed until Bowie Resources LLC has secured the necessary <br />permits from the Colorado Department of Transportation and the U.S. Bureau of Reclamation.
The URL can be used to link to this page
Your browser does not support the video tag.