My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-19_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2008-12-19_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:05 PM
Creation date
12/19/2008 1:29:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
12/19/2008
Doc Name
Proposed Decision & Findings of Compliance for PR11
From
Revise Approved B Seam Mine Plan
Permit Index Doc Type
Findings
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 11, attached to Field Minor Revision No. 17, was complied with when BRL supplied the <br />required permit text. Stipulation No. 12 involved the Applicant Violator System computer check and was <br />terminated. <br />Stipulation No. 13 was added to the decision for Permit Revision No. 6. Stipulation No. 13 was <br />terminated upon submission of the requested permits. Stipulation No. 14 was attached to the decision for <br />Permit Renewal No. 1 and was complied with when the Colorado Division of Wildlife accepted the <br />revegetation plan to substitute shrub clumps for a woody plant density standard in Technical Revision No. <br />46. Stipulation No. 15 was attached to Technical Revision No. 27 and required the submittal of air <br />emissions permits for the coal preparation wash plant. Upon submittal of the air emissions permits, <br />Stipulation No. 15 was complied with. Stipulation No. 16 was attached to TR-30 and required a <br />geotechnical report showing that the factor of safety for gob pile no. 2 was 1.5 or greater. When BRL <br />failed to submit the required geotechnical report, Notice of Violation CV-2005-002 was issued and <br />Stipulation No. 16 was terminated. <br />Stipulation No. 17 was attached to Technical Revision No. 30 and required the submittal of the NPDES <br />permit, air emissions permits, the Section 7 consultation with the USDA-Forest Service and an agreement <br />from the Deer Trail Ditch Company before coal waste disposal site no. 2 could be constructed or before <br />there was any discharge from Pond F. Upon submittal of the documentation, Stipulation No. 17 was <br />complied with. <br />Technical Revision No. 31 was approved with Stipulation No. 18 attached. This stipulation required the <br />submittal of a rockfall report and the construction of a rockfall berm above the facilities area before the <br />mine plan change in the west district could be implemented. Stipulation No. 18 was complied with. <br />Stipulation No. 19 was attached to Technical Revision No. 34 and required the submittal of the necessary <br />air emissions permits before the B-2 coal seam portal bench upland conveyor could be used. The air <br />emissions permits were submitted so Stipulation No. 19 was terminated. <br />Stipulation No. 20 was attached to Succession of Operator No. 2 and required the resolution of one AVS <br />issue before the permit could be transferred from Bowie Resources Limited to Bowie Resources LLC. <br />Stipulation No. 20 was terminated. Also attached to Succession of Operator No. 2 was Stipulation No. 21. <br />This stipulation required proof that the BLM coal leases were transferred from Bowie Resources Limited <br />to Bowie Resources LLC. Stipulation No. 21 was complied with. <br />Stipulation No. 22 was attached to Field Minor Revision No. 52 and required a permit text revision to <br />reflect that BRL could use a pump on a temporary basis to dewater pond B. With the submittal of the <br />permit text changes, this stipulation was complied with. The use of the pump for pond B became <br />permanent through Technical Revision No. TR-38. The approval of the relocation of one gob vent <br />borehole through Field Minor Revision No. 61 was contingent on the resolution of Stipulation No. 23. <br />This stipulation was complied with when the permit text, map and reclamation cost estimate were <br />submitted. <br />Stipulation No. 24 was attached to Technical Revision No. 45 and requires the submittal of permits from <br />CDOT and the Bureau of Reclamation before the elevated conveyor to gob pile no. 3 can be constructed. <br />However, in TR-49 BRL is proposing to use a haul road instead of constructing the elevated conveyor. <br />Therefore, when TR-49 is final, Stipulation No. 24 can be terminated. Field Minor Revision No. 84 had <br />Stipulation No. 25 attached to it. This stipulation required the submittal of revised permit pages and maps <br />describing the topsoil storage project. With the submittal of these materials, Stipulation No. 25 was <br />complied with on November 27, 2007.
The URL can be used to link to this page
Your browser does not support the video tag.