My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981019 (27)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
_INSPECTION - C1981019 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 2:12:40 PM
Creation date
12/19/2008 8:28:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
12/9/2008
Email Name
JRS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. ENFORCEMENT ACTIONS <br /> Colowyo C-1981-019 <br /> 9 December 2008 1� <br /> The following identifies enforcement actions taken during this inspection, the required <br /> abatement and date of abatement for the violation, previous violations still requiring <br /> abatement and the termination of violations cited during previous inspections. <br /> Notice of Violation CV-2008-004 remains outstanding. This violation was issued on 26 <br /> August 2008 for Failure to minimize disturbance to the hydrologic balance in the mine <br /> and associated off-site areas, failure to construct a channel so as to not increase the <br /> potential for downstream flooding and minimize adverse impacts to the hydrologic <br /> balance, failure to construct a permanent diversion to safely pass the peak runoff <br /> from a 10-year storm event, failure to construct a permanent diversion to prevent <br /> additional contribution of suspended solids to stream flow and runoff outside the <br /> permit area, failure to provide adequate pond capacity to contain or treat the runoff <br /> from a 10-year, 24-hour precipitation event, failure to provide a nonclogging <br /> dewatering device on a pond to remove water storage resulting from inflow, failure <br /> to prevent outflow through the pond's emergency spillway during the passage of <br /> runoff resulting from the 10-year, 24-hour precipitation event and failure to provide <br /> adequate freeboard to prevent overtopping of the pond's embankment by sudden <br /> increases in volume. <br /> A proposed penalty was assessed on 24 September 2008. The Division and Colowyo <br /> held assessment conferences on 7 November 2008 and 17 November 2008, Colowyo <br /> did not sign the assessment agreement and the Division fixed a penalty on15 <br /> December 2008. The Division has extended the abatement date for the submittal of <br /> the Technical Revision to 24 December 2008 and for the cleaning of the Prospect <br /> Pond until 20 February 2009. <br /> NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br /> Revised 2/97 <br /> m:\coal\share\forms\8101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.