Laserfiche WebLink
(November 2007) in progress, and the Unit Train Loadout (facilities removal, grading, and revegetation still to <br />be completed). Fill material from a low hill within the UTL facilities area is being utilized for construction of a <br />new access road and reclamation backfill in the South Portals area, as approved in PR-3. Reclamation of the <br />South Portals area is scheduled for completion by mid-2008. Reclamation of the Unit Train Loadout is to be <br />completed by the end of 2009, in accordance with the reclamation schedule set forth in permit Figure 14-1. <br />Temporary sediment and drainage control structures including diversion and collection ditches and sediment <br />ponds will be reclaimed at some point in the future; following demonstration that vegetation cover is sufficient <br />to ensure that sedimentation from reclaimed areas does not exceed that from adjacent undisturbed areas. <br />Sections of the Coal Canyon permanent channel diversion near Pond 6, and the Coal Gulch drainage in the <br />vicinity of Pond 11 will be re-aligned and modified in conjunction with removal of the ponds. Also, several <br />permanent ephemeral drainage channels will be constructed across the North Portal facility reclaimed area in <br />association with removal of the temporary upland diversion and Sediment Pond 13. <br />Permit Renewal No. 5 15 November 16, 2007