The North Decline was backfilled and graded in the spring of 1992. Material that had been piled <br />above the portal area was dozed into the decline. A fair approximation of extrapolated original <br />contours was achieved. The North Decline had been constructed prior to the Act so accurate records <br />of pre-mine contours do not exist. The final reclaimed contours blend with landforms observed in the <br />undisturbed surrounding landscape. The drainage channel of the unnamed drainage was reestablished <br />through the regraded area and riprapped with 12-inch or greater riprap on the 7.5 percent slope areas <br />and 6 inches or greater on the 2.5 percent grades. Some minor settling of the fill has occurred above <br />the portal location since the initial backfilling and grading occurred, and some remedial grading has <br />been performed to fill in settling cracks and ensure proper functioning of the sediment control system. <br />Remaining backfilling and grading work is limited to removal of temporary drainage control <br />structures, and provision of berm breaks along the permanent channel berms to allow reclaimed area <br />runoff to enter the channel. <br />The North Portal facilities area was fully reclaimed in 2002, with the exception oftemporary drainage <br />control facilities, an electrical substation and power line, and portions of two topsoil stockpiles. In <br />conjunction with future removal of the temporary upper diversion ditch and Sediment Pond 13, several <br />approved ephemeral drainage channels will be constructed across the reclaimed surface. <br />Between 2000 and 2003 several other disturbed areas were fully reclaimed, including the 2 West <br />Portals, South Fan, "B" Substation, the major portion of refuse area CRDA-1, entirety of CRDA-2, the <br />CBA-1 and RSRDA Soil Borrow Areas, and northern segment of the overland conveyor corridor. Soil <br />Borrow Area CBA-2 was fully excavated and interim reclamation was completed. Final grading of <br />CBA-2 will occur in conjunction with removal of Sediment Pond 11, and will entail re-alignment of <br />the lower segment of the Coal Gulch drainage channel in the vicinity of Pond 11. Interim reclamation <br />of the Coal Creek permanent diversion channel between the upper dip section culverts and the large <br />double culverts beneath Haul Road 4 was completed in 2002; final reclamation of the channel segment <br />will occur in conjunction with future removal of Sediment Ponds 6 and 10. <br />Phase 1 bond release (SL-02) was approved in August 2003 for various disturbance areas. The <br />decision documented backfilling and grading compliance for CRDA-2 and most of CRDA-1 <br />(excepting the temporary road left open for further disposal), RSRDA slopes, Soil Borrow Area CBA- <br />I and the RSRDA Soil Borrow Area, South Fan disturbances, 2 West Portal disturbances, "B" <br />Substation Site, the North Decline, the North Portal Facilities (excepting certain remaining support <br />facilities and future drainage channel construction), and various other miscellaneous areas. Please <br />refer to the SL-02 findings document for additional detail. <br />VIII. Permits Incorporating Variances from Approximate Original Contour Restoration Requirements for <br />Steep Slope Mining. <br />Steep slopes as defined in Rule 1.04(125) exist in the South Portal disturbed area and they are <br />depicted on Exhibit 6C. As allowed for in Rule 2.06.5, SCC has requested an AOC variance for these <br />steep slopes to allow for an alternative commercial postmining land use. The specific findings <br />required by Rule 2.06.5 and by Rule 4.27.4 are discussed below. <br />Steep slopes are defined as any slope above 20 degrees or such lesser slope as may be determined by <br />the Board or Division after consideration of soil, climate and other characteristics of a region. Based <br />Permit Renewal No. 5 41 November 16, 2007